Preparation Overview; Site Preparation Checklist For Ex4500 Switches; Table 34: Site Preparation Checklist; Chapter 6 Preparation Overview - Juniper EX4500 Hardware Manual

Hide thumbs Also See for EX4500:
Table of Contents

Advertisement

CHAPTER 6

Preparation Overview

Site Preparation Checklist for EX4500 Switches

Table 34: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Copyright © 2017, Juniper Networks, Inc.
Site Preparation Checklist for EX4500 Switches on page 67
Environmental Requirements and Specifications for EX Series Switches on page 68
General Site Guidelines on page 72
Site Electrical Wiring Guidelines on page 73
Chassis Physical Specifications for EX4500 Switches on page 73
Rack Requirements on page 74
Cabinet Requirements on page 75
Clearance Requirements for Airflow and Hardware Maintenance for EX4500
Switches on page 76
The checklist in
Table 34 on page 67
preparing a site for EX4500 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series
Switches" on page 68
"AC Power Supply Specifications for
EX4500 Switches" on page 79
summarizes the tasks you need to perform when
Performed by
Date
67

Advertisement

Table of Contents
loading

Table of Contents