12. Mechanical adjustment
11. Put the developing assy and drum assy together.
[1]
150
[1]
[1]
A09AF3C514DA
[1]
[1]
A09AF3C515DA
Field Service Ver. 1.0 Apr. 2007
10. Install the Db gap adjusting jigs [1] in
a space between the sleeve roller
and doctor blade.
12. Press the doctor blade tightly up
against the Db gap adjusting jigs and
tighten the screws [1] in the order of
(1) at the front, (2) at the center, and
(3) in the rear.
NOTE
• The doctor blade mounting screws
have been coated with lock paint
and the job must be completed
within 30 min. If the job extends
more than that time, change the
screws for new ones.