Installing Power Distribution Unit (1U) - Fujitsu ETERNUS DX60 S3 Configuration Manual

Disk storage system
Hide thumbs Also See for ETERNUS DX60 S3:
Table of Contents

Advertisement

Chapter 2
Rack Installation
2.1
Installing Power Distribution Unit (for Regions Other than EMEA&I)
2.1.1

Installing Power Distribution Unit (1U)

This section describes how to install the 1U power distribution unit in a rack.
1
Remove the two brackets temporarily attached to the power distribution unit.
Remove the two M3 screws from the front of the power distribution unit to free the brackets.
Bracket A
M3 screw
2
Attach the brackets and holders to the rack.
Screw
holder
M6 screw
The four M6 screw positions for the brackets are determined relative to the power distribution unit base
line.
The four M6 screws should be inserted in the 1st and 3rd holes above the base line.
3rd hole
(M6 screw)
1st hole
(M6 screw)
Power distribution unit
Bracket B
M3 screw
Bracket A
Holder
Holder
(Rack pillar: rear)
M6 screw
(Rack pillar: rear)
[Left]
1U
Power distribution unit
Power distribution unit
base line
Bracket
FUJITSU Storage ETERNUS DX60 S3 Disk storage system Configuration Guide (Basic)
Copyright 2014 FUJITSU LIMITED
Bracket B
Screw
holder
[Right]
3rd hole
(M6 screw)
1st hole
(M6 screw)
26
P3AM-9002-01ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents