Bosch DCN Next Generation Operation Manual page 168

Table of Contents

Advertisement

168
en | Connection
3.
4.
Figure 6.82: Stripping a fiber
5.
Notice!
Do not forget to remove the piece of sheath from the tool.
6.
Figure 6.83: Stripped optical fibers
Attach the ferrules
Do as follows:
1.
2013.11 | V2.0 | DCN-NG_OM_V4.x
Repeat steps 14 and 15 for the other plastic optical fiber in the cable. Both fibers now
have the correct length.
Put one of the optical fibers into the front part of the POF cutter/stripping tool (tool 6).
Close the tool and pull the fiber out to remove the sheath.
Repeat steps 17 and 18 for the other fiber in the cable. Refer to the figure to see the
result of this part of the cable-connector mounting procedure.
A
Put a ferrule into the spring-loaded stop of the POF positioning/crimping tool (tool 4).
B
Operation Manual
Conference System
Bosch Security Systems B.V.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents