MUTOH ValueJet Service Manual page 141

Wide format
Table of Contents

Advertisement

ValueJet 1304 Service manual
4. Remove the CR board cover.
Up to step 4 in
5. Remove the CR tape wire from the CR board.
6. Remove the screw retaining the bearer mounting material and the bearer fixing material (tapping screw
×
M 3
8, S tight cup: 2) (M3
1
2
7. Remove the bearer mounting material and the bearer fixing material.
(2) Replacing Ink Tube
1. Loosen the joint screw (M6) connecting the ink tube and the F branch.
表 4-109
"4.6.1 Replacing Print Head" p.4-61
×
8, P tight cup: 1).
表 4-110
No.
1
Tube guide
2
Tube film guide retainer
2
No.
1
Bearer mounting material
2
Bearer mounting material
screw (M3
3
Screw retaining the bearer
fixing material (M3
tight)
4
Bearer fixing material
4-95
Part name
Part name
×
8, S tight)
×
8, P
AP-74109 Rev 1.1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Valuejet 1304

Table of Contents