Charging System; A.c. Generator Inspection - KYMCO GRAND DINK 250 Manual

Hide thumbs Also See for GRAND DINK 250:
Table of Contents

Advertisement

16
. BATTERY/CHARGING SYSTEM

CHARGING SYSTEM

CURRENT TEST
Use a fully charged battery (12.8V min.)
to check the charging system.
Warm up the engine before taking readings.
Connect an electric tester across the battery
terminals.
Disconnect the red wire from the fuse
terminal and connect an ammeter between the
red wire lead and the fuse terminal.
Attach a tachometer to the engine.
Start the engine and gradually increase the
engine speed to measure the limit voltage and
current.
Limit Voltage/Current: 14 15V/0.5A max.
If the limit voltage is not within the specified
range, check the regulator/rectifier.
PERFORMANCE TEST
Engine Speed
Charging Current
When measuring the charging current,
disconnect the black wire from the
regulator/rectifier wire coupler.
If the readings do not meet the specified
values, check the regulator/rectifier.

A.C. GENERATOR INSPECTION

This test can be made without removing
the stator from the engine.
the yellow wire from the auto bystarter.
Remove the frame center cover.
Disconnect the A.C. generator connector.
Check the continuity between the yellow
wires and ground.
There should be continuity between the
yellow wires and no continuity between each
yellow wire and ground.
Resistance:
Yellow Yellow
16-5
(5000rpm max.)
2500rpm
5000rpm
7A min.
9A min.
Disconnect
0.6 1.6Ω
GRAND DINK 250
Red Wire
A.C. Generator Connector

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents