Ignition Switch Inspection; Starter Motor Relay Inspection - Suzuki GF60A Service Manual

Table of Contents

Advertisement

Contact points test
Put the plunger on the under side and then push the
magnetic switch down.
At this time, check for continuity between terminal "B"
and terminal "M".
Continuity indicates proper condition. If no continuity
exists, replace the magnetic switch and/or plunger.
Special tool
(A): 09930–99320 (Digital tester)
Tester knob indication
Continuity (
)

Ignition Switch Inspection

Inspect the ignition switch using the following
procedures:
1) Disconnect the ignition switch from remo-con box
wiring harness.
2) Check continuity between wiring leads at the key
positions shown in the chart.
3) If out of specification, replace the ignition switch.
Special tool
: 09930–99320 (Digital tester)
Tester knob indication
Continuity (
)
Key position
B
G
OFF
ON
START
FREE
PUSH
(A)
I9J011190040-01
ZAJ6111906006
Switch Lead Wires
W
Gr
Br
: Continuity
I9J011190041-03
Bl
Gr
Br
Br

Starter Motor Relay Inspection

Inspect the starter motor relay using the following
procedures:
1) Disconnect the starter motor relay from the fuse box.
O
Starting System:
(OFF)
FREE
PUSH
Br
W
W/R
G
G
B
1
1. Starter motor relay
1I-16
(ON)
(START)
O
B
Bl
Gr
I9J011190042-02
ZAJ6111906007
IAJ611190015-01

Advertisement

Table of Contents
loading

Table of Contents