1F-5 Power Unit Cooling System:
Installation
1) Install O-ring (1) to pressure valve cover (2).
2) Install pressure valve (3) and pressure valve cover
(2) to oil pan and secure with bolts (4).
3
3) Install lower side cover.
Refer to "Lower Side Cover Removal and
Installation" in Section 2A (Page 2A-3).
Water Pressure Valve Related Item Inspection
Inspect the water pressure valve in the following
procedures:
1) Remove the water pressure valve.
Refer to "Water Pressure Valve Removal and
Installation" (Page 1F-4).
2
1
I9J011160013-01
4
2
IAJ611160011-01
ZAJ6111606004
2) Inspect the water pressure valve.
If salt deposits, corrosion, wear or other damage is
found, clean or replace.
Inspect O-ring. Replace if nicked, cut or torn.
3) Install the water pressure valve.
Refer to "Water Pressure Valve Removal and
Installation" (Page 1F-4).
Water Pump Removal and Installation
Refer to "Water Pump Removal and Installation" in
Section 3A (Page 3A-6).
Water Pump Related Item Inspection
Refer to "Water Pump and Related Items Inspection" in
Section 3A (Page 3A-8).
Water Tube Removal and Installation
Removal
Refer to "Engine Holder / Oil Pan / Driveshaft Housing /
Mounts Disassembly" in Section 2A (Page 2A-13).
Installation
Refer to "Engine Holder / Oil Pan / Driveshaft Housing /
Mounts Assembly" in Section 2A (Page 2A-15).
Water Tube Related Item Inspection
Refer to "Engine Holder / Oil Pan / Driveshaft Housing /
Mounts Related Component Inspection" in Section 2A
(Page 2A-19).
I9J011160015-01
ZAJ6111606005
ZAJ6111606006
ZAJ6111606007
ZAJ6111606008