Lower Side Cover Removal And Installation; Tiller Handle Removal And Installation (Th Model) - Suzuki GF60A Service Manual

Table of Contents

Advertisement

Lower Side Cover Removal and Installation

Removal
1) Pull the hook lever (1) out and remain the lever at
this position.
2) Remove the side cover rubber (2).
3) Remove eight screws (3) and PORT side cover (4).
4) Disconnect PTT switch lead connector.
ZAJ6112106002
1
IAJ611210005-01
2
IAJ611210006-01
3
4
IAJ611210007-01
IAJ611210008-01
5) Remove two screws (5) and STBD side cover (6).
Installation
Installation is reverse order of removal with special
attention to the following step.
• Tighten side cover screws to specified torque.
Tightening torque
Side cover screw: 3 N·m (0.3 kgf-m, 2 lbf-ft)
Tiller Handle Removal and Installation (TH
model)
Removal
Before removing tiller handle, disconnect battery cables
from battery.
1) Remove the PORT lower side cover.
Refer to "Lower Side Cover Removal and
Installation" (Page 2A-3).
2) Cut the band (1), then remove the rigging port
grommet (2).
Housing and Bracket:
5
6
IAJ611210009-01
ZAJ6112106014
2
1
IAJ611210010-01
2A-3

Advertisement

Table of Contents
loading

Table of Contents