Ricoh B089 Service Manual page 177

Hide thumbs Also See for B089:
Table of Contents

Advertisement

[B]
[C]
B408I104.WMF
2. Install the front joint bracket [A] ( x 2 M4 x 17) and rear joint bracket [B]
( x 1 M4 x 17).
3. Remove the left stand [C] ( x 3)
4. Install the lower grounding plate [D] on the finisher ( x 2 M3 x 8).
NOTE: Use the screw removed in step 1 and the screw from the accessory
box.
5. Open the front door [E]. Then pull the locking lever [F].
6. Align the finisher on the joint brackets, and lock it in place by pushing the
locking lever.
7. Secure the locking lever ( x 1 knob M3 x 8) and close the front door.
8. Install the copy tray [G] ( x 1 knob M4 x 10).
9. Connect the finisher cable [H] to the main machine.
SM
1000-SHEET FINISHER INSTALLATION
[A]
[H]
[G]
B408I105.WMF
3-43
[E]
[D]
B089/B093
[F]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B093B08Aficio 2022Aficio 2027

Table of Contents