Epson AcuLaser C4000 Service Manual page 313

Color laser page printer
Hide thumbs Also See for AcuLaser C4000:
Table of Contents

Advertisement

EPSON AcuLaser C4000/C4100/C3000
Step
PWBA Feeder (PL17.4.1) continuity
1. Disconnect the P/J81 and P/J82 connectors of the PWBA Feeder.
8
2. Check the continuity between P81-16 <=> P82-7.
Is there continuity between P81-16 <=> P82-7?
Harness Assy OPF PLG (PL17.4.2), Harness Assy OPFREC (PL4.2.9) and Harness Assy
OPF Main (PL15.2.8) continuity check
1. Disconnect the P/J81 connector from the PWBA MCU & HVPS. (Refer to Ch4-4.2.18.1)
2. Disconnect the P/J21 connector from the PWBA Feeder (PL17.4.1).
9
3. Check the continuity for the following lines.
J81-16 <=> J810-A11/P810-A4 <=> J210-B11/P210-B3 <=> J21-11
Is there continuity between each terminal?
PWBA Feeder (PL17.4.1) continuity
1. Disconnect the P/J81 and P/J82 connectors of the PWBA Feeder.
10
2. Check the continuity between P81-24 <=> P82-5.
Is there continuity between P81-24 <=> P82-5?
Harness Assy OPF PLG (PL17.4.2), Harness Assy OPFREC (PL4.2.9) and Harness Assy
OPF Main (PL15.2.8) continuity check
1. Disconnect the P/J81 connector from the PWBA MCU & HVPS. (Refer to Ch4-4.2.18.1)
2. Disconnect the P/J21 connector from the PWBA Feeder (PL17.4.1).
11
3. Check the continuity for the following lines.
J81-24 <=> J810-A3/P810-A12 <=> J210-B3/P210-B11 <=> J21-3
Is there continuity between each terminal?
Troubleshooting
Check
Level 2 FIP –Large Capacity Paper Unit–
Treatment
Yes
Replace the PWBA Feeder.
Go to step 9.
(Refer to Ch4-4.2.20.10)
Replace the PWBA MCU &
Replace any Harness Assy with
HVPS. (Refer to Ch4-4.2.18.1)
no continuity.
Replace the PWBA Feeder.
Go to step 11.
(Refer to Ch4-4.2.20.10)
Replace the PWBA MCU &
Replace any Harness Assy with
HVPS. (Refer to Ch4-4.2.18.1)
no continuity.
Revision F
No
3-297

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aculaser c3000Aculaser c4100

Table of Contents