InfiniBand FDR Switch Platform Hardware User Manual
15. Screw the upper brackets onto the vertical supports and tighten in place. See
Figure 23. You will need the socket wrench with both extensions to tighten these
bolts.
16. Slide the chassis onto the shelf until the face plate of the chassis touches the vertical
rack support.
17. Make sure the upper brackets are installed in their correct location.
18. Screw the 8 bolts through the faceplate into the caged nuts, DO NOT TIGHTEN.
19. For each offset and upper bracket, screw six bolts through the offset into the upper
bracket. See Figure 24. Use one flat washer and one lock washer for each of these
bolts. DO NOT TIGHTEN.
Mellanox Technologies

Figure 23: Upper Brackets and Offset Location

Figure 24: Offset to Upper Bracket Bolts

Figure 25: Location for the Lock-Down Bar

Bottom of
the chassis
34