Front Operating Position - IBM H Series Installation And Service Manual

Enterprise server
Table of Contents

Advertisement

Front Operating Position

To place the drawer into the front operating position from the front service position,
follow these steps:
1. Replace, in reverse order, the bottom air baffle, the I/O air duct or the foam
block, the top air baffle, and the front access cover.
2. Slide the drawer into the rack. If the drawer does not slide all the way in, go to
the rear of the rack and realign the drawer, and then slide it in the rest of the
way.
3. To perform the next step, use a screwdriver or similar tool to depress the spring
detents that hold the stops in position.
4. Replace the screws that attach the front bezel to the rack.
5. Replace the screws that attach the drawer to the rear of the rails at the rear of
the rack.
6. Connect the following cables that were removed earlier from the rear of the CPU
Drawer:
Adapter cables and cords
Keyboard cable
Display cable
Power cords
7. If the rack has a rear door, close it.
8. Do the steps in the power on procedure as detailed in "Starting the System Unit"
in Chapter 2 of RS/6000 Enterprise Server Model H Series User's Guide.
9. If the rack has a front door, close it.
Chapter 7. Removal and Replacement Procedures
7-61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs/6000 h seriesRs/6000 h50Rs/6000 h70

Table of Contents