Placing A 9008-22L, 9009-22A, Or 9223-22H System Into The Operating Position - IBM Power Systems 9008-22L Manual

Power systems, system processor modules
Hide thumbs Also See for Power Systems 9008-22L:
Table of Contents

Advertisement

2. Open the side latches (A) and pull the latches to slide the system unit fully into the service position,
until the slides click and hold the system unit securely. Ensure that the screws inside the latches are
not secured to the rack.
Remove the hook-and-loop fasteners that secure the cable management arms. Ensure that the cable
management arms can move freely. Ensure that the cables at the rear of the system do not catch or
bind as you pull the system unit into the service position.
Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the
rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull
out more than one drawer at a time.
Figure 34. Releasing the side latches
Placing a 9008-22L, 9009-22A, or 9223-22H system into the operating
position
Use this procedure to place the rack-mounted IBM Power System L922 (9008-22L), IBM Power System
S922 (9009-22A), or IBM Power System H922 (9223-22H) server into the operating position.
46
Power Systems: System processor modules for the 9008-22L, 9009-22A, or 9223-22H

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power systems 9009-22aPower systems 9223-22hPower system 9009-22aPower system 9008-22lPower system 9223-22h

Table of Contents