Chapter 3. Error Code To Fru Index - IBM H Series Installation And Service Manual

Enterprise server
Table of Contents

Advertisement

Table 3-8 (Page 4 of 10). Firmware Checkpoints.
Checkpoint
Description
E155
Probe PCI bridge secondary bus
E156
Create PCI Ethernet node
E15A
Create 64 bit host (primary) PCI
controller node
E15B
Transferring control to Operating
System (service mode boot)
E15C
Probe primary 64 bit PCI bus
E15D
Create host PCI controller node
E15E
Create MPIC node
E15F
Adapter VPD probe
E160
CPU node VPD creation
E161
Root node VPD creation
E162
service processor node VPD cre-
ation
E164
Create PCI graphics node (P9)
E168
Create PCI graphics node (S3)
E16C
GTX100P Subsystem Open request.
E16D
GTX100P Planar not detected or
failed diagnostics.
E16E
GTX100P Subsystem Open suc-
cessful.
E16F
GTX100P Close Subsystem.
E170
Start of PCI Bus Probe
E171
Executing PCI-Delay function
E174
Establish host connection
E175
BootP request
Action/
Possible Failing FRU
Go to "Step 1540-25" on page 2-61.
If a network adapter or I\O board is
replaced, see 3-1.
See the note on 3-45.
See the note on 3-45.
See "Boot Problems and Concerns"
on page 3-65.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
See the note on 3-45.
Refer to "Boot Problems and
Concerns" on page 3-65 for general
considerations.
Refer to "Boot Problems and
Concerns" on page 3-65 for general
considerations.
1. Turn off then on, and retry the
boot operation.
2. Verify the network connection
(network could be down).
3. Have network administrator
verify the server configuration
for this client.

Chapter 3. Error Code to FRU Index

3-55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs/6000 h seriesRs/6000 h50Rs/6000 h70

Table of Contents