IBM H Series Installation And Service Manual page 159

Enterprise server
Table of Contents

Advertisement

Table 3-7 (Page 3 of 3). Model H70 Service Processor Checkpoints
Checkpoint
Description
E0E1
Pull CPU out of reset: okay
E0E2
Check point for hot-swap fans and
power supply.
OK
SP Ready Waiting for Power-On
STBY
SP Ready; System was shutdown
by the operating system and is still
powered on.
Action/
Possible Failing FRU
1. Remove processor card in slot
2 (if installed) and see if the
problem is resolved. If problem
is resolved replace processor
card. If not continue.
2. Exchange processor card in slot
1 with the processor card
removed in step 1 (or
replaceprocessor card if only
one processor card exists) and
see if problem is resolved. If
problem is resolved replace
processor card. If not continue.
3. System board.
4. I/O board. (See notes on 3-1.)
Power supply hot-swap is in
progress. Fans and power supply
must be replaced within 5 minutes.
After 5 minutes the service
processor initiates a fast shutdown
of the system.
None. Normal operation.
This condition can be requested by
a privileged system user with no
faults. See service processor error
log for possible operating system
fault indications.
Chapter 3. Error Code to FRU Index
3-51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs/6000 h seriesRs/6000 h50Rs/6000 h70

Table of Contents