Placing An 8335-Gtb System Into The Operating Position; Slide Rails - IBM Power System S822LC Manual

Hide thumbs Also See for Power System S822LC:
Table of Contents

Advertisement

Figure 222. Disconnecting the water hoses
3. Remove the screws on either side of the system that secure the system to the rack.
4. While one person is supporting the weight of the front of the system, have the second person move to
the rear of the system and push the system partially out of the rack.
5. Position one person on the left side of the system and one person on the right side of the system.
6. Tilt and lift the system from the rails.
7. Carefully set the system on a table with an appropriate ESD surface.

Placing an 8335-GTB system into the operating position

Learn how to place an IBM Power System S822LC (8335-GTB) system into the operating position.
About this task
Pick the proper type of rails for your system:
v "Slide rails"
v "Fixed rails" on page 208

Slide rails

Use this procedure when your system is installed using slide rails.
Before you begin
When you place the system in the operating position, ensure that the cables at the rear of the system do
not catch or bind as you push the system unit back into the rack.
Procedure
1. Unlock the blue rail safety latches (A) by lifting them upward.
207
Common procedures for servicing or installing features

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 8335-gtb

Table of Contents