v When you slide a system out of a rack, ensure that all stability plates are firmly installed to prevent the
rack from toppling. Slide only one system out at a time.
v When the rails are fully extended, the rail safety latches lock into place. This action prevents the
system from being pulled out too far.
Procedure
1. Label and remove all cables from the rear of the system.
2. Remove the front screws that secure the system to the rack from both sides of the system as shown in
Figure 59.
Figure 59. Removing the front screws and removing the system from the rack
3. Pull the system unit out of the rack.
CAUTION:
v The chassis rails only extend about half of the distance of the chassis. Once the safety latches
are released, the chassis only slides forward a few inches before disengaging from the rails. Be
prepared to support the full weight of the chassis as you remove it from the slide rails.
v The chassis contains most of the weight in the back side of the unit. When you remove the
system, take care to be ready to support the weight by grasping the chassis closer to the back of
the unit.
4. Using two people, release the rail safety latches and remove the system from the rails. The safety
latches work in opposite directions; the latch on one side moves up while the latch on the other side
moves down.
5. Carefully set the system on a table with an appropriate ESD surface.

Placing an 8001-12C system into the operating position

Learn how to place an IBM Power System S821LC (8001-12C) system into the operating position.
98
Power Systems: Installing the IBM Power System S821LC (8001-12C)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system 8001-12c

Table of Contents