NEC Express5800/R320a-E4 User Manual page 338

Hide thumbs Also See for Express5800/R320a-E4:
Table of Contents

Advertisement

5-178 Installing and Using Utilities
Partner State
DC Off
BIOS POST
Hung: BIOS POST
OS Booting
Hung: OS Booting
OS Up
Hung: OS Up
OS Rebooting
Hung: OS Rebooting
OS Shutting Down
Hung: OS
OS Crashed
OS Shut Down
TIPS:
Activity Log, page 5-173
Saving the Activity Log to a File, page 5-179
Troubleshooting, page 5-179
Description
The partner system operating system is shut down and standby power
is off.
The partner system is performing a BIOS Power On Self Test
(POST).
The partner system hung in the BIOS POST.
The partner operating system is booting.
The partner system hung in the boot process.
The partner operating system is up. (However, the system might not be
available for use until other system resources finish loading.)
The partner operating system is hung.
The partner operating system is rebooting.
The partner system hung while rebooting.
The partner operating system is shutting down.
The partner system hung while it was shutting down.
The partner operating system crashed.
The partner operating system finished shutting down, but the system is
still powered on.

Advertisement

Table of Contents
loading

Table of Contents