NEC Express5800/R320a-E4 User Manual page 259

Hide thumbs Also See for Express5800/R320a-E4:
Table of Contents

Advertisement

6.
When you are finished installing software on the Upgrade Side, you disconnect the remote
connection to the Upgrade Side and initiate the merge process.
When you merge the system, the Active Upgrade Console stops your applications on the
Production Side and unmounts any application data disks to ensure that pending disk updates
are flushed to disk. It then merges system resources so that the network, external storage, and
application data disks become available to the whole system again. With the exception of the
internal disks, all critical system resources return to duplex mode (Figure 3).
Figure 3. Merged System
Finally, the system restarts your applications, including the Active Upgrade Console, from the
Upgrade Side system disk. Depending on the complexity of your applications and the upgrade
you performed, your applications may be backed up and running in under a minute.
7.
After the system is successfully merged, you can test your applications and verify the success
of your upgrade(s) with full access to the system's resources. If you discover a problem, you
can still abort the upgrade process and restore the system to its previous state, because the
original copy of your system disk (on the Production Side) has not been overwritten yet.
8.
When you are certain that the upgrade(s) were successful, you can commit the changes to make
them permanent.
When you commit the changes, the Active Upgrade Console resynchronizes the RDR disks in
your system by overwriting the original Production Side system disk and stale Upgrade Side
data disks with their partner disks, which are up-to-date (Figure 4).
NOTE:
Because the original version of your system disk is erased during the commit process, you
cannot abort an upgrade session after initiating the commit process.
Installing and Using Utilities 5-99

Advertisement

Table of Contents
loading

Table of Contents