NEC Express5800/R320a-E4 User Manual page 337

Hide thumbs Also See for Express5800/R320a-E4:
Table of Contents

Advertisement

Upgrade State
Prepare Merge
Merge
Commit
Abort
The Operational State reports the status of the last operation that was requested. Table describes the
possible operational states.
Table 3 Status: Operational State
Operational State
Ready
Busy
Broken
The Partner State reports the status of the partner system. For example, while the system is in split
mode, the Active Upgrade Console is running on the Production Side, and this field reports the
health of the Upgrade Side of the system. Table 4 describes the possible partner states.
Table 4 Status: Partner State
Partner State
DC On
Description
Otherwise, the Active Upgrade Console is in the process of initiating
split mode.
The Active Upgrade Console is preparing to merge the system by
running additional readiness tests and background tasks.
If the operational state is Ready, the system is merged. Otherwise, the
Active Upgrade Console is in the process of merging the system.
The Active Upgrade Console is in the process of committing your
changes (making them permanent).
The upgrade process has been aborted, and the Active Upgrade
Console is in the process of restoring the system to its previous state.
Description
The previous operation has been completed successfully. The Active
Upgrade process is ready to enter the next upgrade state.
The current operation is still in progress. Allow time for the operation to
complete.
The Active Upgrade Console could not complete the current operation.
Check the activity log for errors. You must correct the errors and click
Retry to complete the operation, or click Abort to abort the current
upgrade session.
Description
The partner system operating system is shut down, but the system still
has standby (housekeeping) power.
Installing and Using Utilities 5-177

Advertisement

Table of Contents
loading

Table of Contents