NEC Express5800/R320a-E4 User Manual page 308

Hide thumbs Also See for Express5800/R320a-E4:
Table of Contents

Advertisement

5-148 Installing and Using Utilities
To perform a readiness test, choose to do one of the following:
Click Next on the Upgrade Summary page (if you are using a configuration file).
Click Active Upgrade on the navigation bar (the readiness test starts automatically if you
have recently opened or changed your configuration).
Click Retry on the Active Upgrade page.
Click No Configuration File on the Configuration page.
The activity log reports the overall results of the readiness check as well as the results for each
individual test. The below list describes the general meaning of the activity log entries.
Activity Log Entries
Icon
Text
Color
Green
Black
Black
Black
Red
The status bar at the bottom of the window will indicate one of the following states for the current
operation:
Busy
A readiness check is in progress. Allow time for the task to complete.
Ready
The system meets the prerequisites for the Active Upgrade process. You can proceed with the
upgrade process by splitting the system.
Broken
One or more components in the system does not meet the prerequisites for the Active Upgrade
process. You must resolve the problem before you can continue with the upgrade.
Severity
Description
Success
Task completed without error
Pending
Task is in progress
Information
Task information, no action necessary
Warning
A problem that should be addressed, but will not block an
upgrade
Error
A problem that must be corrected before continuing with
upgrade

Advertisement

Table of Contents
loading

Table of Contents