Installing And Removing The Romb Battery Pack For The Mezzanine Raid Card - Gateway E-9525R User Manual

E-9525r servers
Hide thumbs Also See for E-9525R:
Table of Contents

Advertisement

11
12
13
14
15
16
17
Installing and removing the ROMB battery pack
for the mezzanine RAID card
To remove and install a ROMB battery pack for the mezzanine RAID card:
1
2
3
4
www.gateway.com
Slide the backplane to the right, locking it into place on the backplane bracket.
Insert the backplane bracket and backplane into the chassis (3) between the two rows of
button-shaped fixtures on the bottom of the chassis.
Reconnect all cables to the backplane.
Replace the system fans and fan duct by following the instructions in
fans" on page 44.
Follow the instructions in
Reinstall the hot-swap drives back into the server. Make sure that you install the drives into
the same bays you removed them from in
installing a hard drive" on page
Replace the bezel by snapping it into place on the front of the server.
Follow the instructions in
that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.
Follow the instructions in
Push the release lever (1), then lift the ROMB battery pack for the mezzanine RAID card (2)
out of the chassis.
Align the new battery with the battery slot, then push the new battery into the slot until
it clicks into place.
"Closing the server case" on page
Step
4. For instructions see
37.
"Preventing static electricity discharge" on page
"Opening the server case" on page
"Replacing system
32.
"Removing and
30. Make sure
31.
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents