Preparing To Install The Weather Station Components - Fourier MultiLogPRO User Manual

Hide thumbs Also See for MultiLogPRO:
Table of Contents

Advertisement

Note: When you let go of the wind cups, they should drop slightly.
D.
Spin the wind cups. If they do not spin freely, loosen the setscrew
and lower the cups slightly. Repeat until the wind cups spin freely.
3.
Attach the Wind Vane:
A.
Place the wind vane on the shaft (see Figure 10)
B.
Slide the wind vane down the shaft as far as it will go
C.
Use the Allen wrench provided to tighten the setscrew on the side
of the wind vane.
4.
Check the Anemometer Base Orientation:
A.
Insert the anemometer arm into the base
B.
Attempt to push the #4-40 x 1 1/4" pan head screw through the
holes in the arm and the base (see Figure 15).

4.2.7 Preparing to Install the Weather Station Components

For easy mounting we advise you to slide the Weather Station
components (except for the main Weather Station box) over the tripod's
extension tube before raising it to its maximum height. Slide the
components in the following order:
First the Solar Panel: Slide the two -bolts that are connected to
1.
the back of the solar panel box over the tripod's extension tube
Figure 10: Installing the wind vane
Station Installation
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MultiLogPRO and is the answer not in the manual?

Table of Contents