Checking the System
Before starting the system, review the following items:
u
All hardware is properly and securely installed in the rack.
u
The cables are properly attached to the base unit, and there is enough cable server loop to
allow the base unit to extend from the rack.
u
The cables that run along the sides or top of the rack are installed in clips or ties to secure
them in place.
u
All disk drives are installed in the proper slots and labeled appropriately.
u
The base unit is retracted into the rack.
u
The voltage selection switch is set to the proper voltage for your location (115 volts or
240 volts).
u
The power cord from the AC distribution box or UPS is connected to the correct power
outlet.
WARNING
Once you install equipment into the rack, do not move the rack. If you must move the
rack, first remove all equipment, move the rack to its new location, and then reinstall
the equipment.
Starting the System
WARNING
If you start the system, and then turn it off before completing the instructions in
Chapter 2, "Setting Up the Software," you will have to reload the operating system and
system software. See "What's Next" for more information.
To start the system, press and hold the Power button for six seconds, and then release the
button. The Power button is shown in the following figure. If you have an AC distribution
box connected to the system, make sure its power switch is turned on before you start the
system.
See Chapter 2, "Setting Up the Software, " before using the Power button to start the system
for the first time. See Chapter 4, "Operating Notes, " for detailed information on using the
Power button.
17
Need help?
Do you have a question about the InterServe 80 SL and is the answer not in the manual?
Questions and answers