Hitachi XP P9500 User Manual page 446

Hitachi dynamic link manager software user guide for aix (6.6) (t5208-96012, november 2011)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

load distribution using load balancing
log filter
2-31
logging level
values
6-19
logical device file
Glossary-4
logical unit
2-3
logical unit ID
6-48
logical volume number
LU
2-4
configuration
2-5
LU (Logical Unit)
Glossary-4
LUN
6-48
M
manual path switching
message
examining
5-5, 5-6
message level
8-3
Messages
8-1
adjusting the number of messages to be output
3-82
checking contained error information
migration
3-11
monitoring interval
3-81
N
narrowing down
hardware causing error
node
Glossary-4
non-owner controller
2-10, Glossary-5
Notes
Using Hitachi Network Objectplaza Trace Library
3-79
Notes on creating an HDLM environment
Notes on a license key
Notes on an upgrade installation or re-
installation of HDLM
Notes on installing HDLM
Notes on storage systems
Notes on the automatic failback
Notes on the cluster
Notes on the queue_depth parameter value for
an HDLM-managed device
Notes on the virtual I/O server
Notes on trace files
Index-4
2-8
Glossary-2
2-18
5-2
5-5
2-10, Glossary-4
3-14
3-12
3-12
3-15
3-16
3-15
3-16
3-13
3-14
Hitachi Dynamic Link Manager User Guide (for AIX(R))
number of error log files
number of trace files
6-20
O
obtaining
path information
5-5
program information
offline
2-13, 6-6
offline(C) status
2-19
offline(E) status
2-20
online
2-13, 6-11
online status
2-19
online(E) status
2-19
operating environment
setting
6-16
operation name
8-3
operations
6-2
displaying format
6-4
of the HDLM command
OS, supported
3-3
overview
commands
6-2
HDLM
1-1
owner controller
2-10, Glossary-5
owner path
2-10, Glossary-5
P
P
2-4
path
2-3, Glossary-5
checking the configuration
path error
handling
5-3
path health checking
1-3, 2-28, 6-21, Glossary-5
path information
obtaining
5-5
Glossary-6
path priority number
2-15
path status transition
path switching
automatically
2-14
manually
2-18
PathID
5-2
PathName
5-3
Paths to which load balancing is applied
PCI bus number
6-47
6-19
5-6
Glossary-5
6-16
6-2
3-67
2-19
2-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents