3. Observe the front panel LEDs for a successful power-up sequence.
Table 4-1 describes a successful power-up sequence.
Table 4-1: Front Panel LED Activity During the Power-Up
Sequence
Item
Power On/Standby LED
Internal health LED
External health LED
NIC LED
Note: For a detailed explanation of all system LEDs, refer to Appendix E,
"LED Indicators and Switches."
When the server powers on for the first time, the server performs a POST and
launches RBSU. After selecting initial system settings, install the operating system
and perform additional configuration tasks. For additional information about
configuring the server with RBSU, refer to the HP ROM-Based Setup Utility User
Guide.
HP ProLiant ML370 Generation 3 Server Setup and Installation Guide
Description
From amber to green
From off to green
From off to green
From off to green (when linked to the network)
From off to flashing green for network activity
Installing the Rack Server