Chapter 8
13. Remove the server management cable from the Legacy I/O board.
14. Remove both IDE cables (DVD and Floppy Disk Drive) from the Legacy
I/O board by grasping the ends of the cable connectors and rocking them
out of their respective connectors.
15. Carefully lay the board component side up on an antistatic work surface or
inside proper packaging.
Installing the Legacy I/O Board
To install the Legacy I/O Board, complete the following procedure:
1. Observe the safety and ESD precautions at the beginning of this chapter.
Figure 8-6. Removing Legacy I/O Board
Server Management Boards
Server Management
Cable
DVD Cable
Floppy Disk
Drive Cable
95