Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 302

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Installing the Air Filter Assembly on a Catalyst 6509-NEB-A Switch or a Catalyst 6509-V-E (Optional)
Figure 4-76
1
1
Filter cage assembly
2
Filter
3
Filter retainer
Step 6
Install the filter assembly with the tabs facing the floor, as follows:
Fit the tabs (see
a.
(See
b.
Rotate the filter assembly towards the intake panel. (See
c.
Tighten the two fastening screws.
Catalyst 6500 Series Switches Installation Guide
4-96
Placing the Foam Filter Over the Filter Retainer
2
4
Figure
4-76) on the bottom of the filter cage assembly into the lower support loops.
Figure
4-74.)
Chapter 4
3
4
Tabs
5
Thumb loops
Figure
Removal and Replacement Procedures
5
4-77.)
OL-5781-08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents