Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 193

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 3
Installing the Switch
Figure 3-42
CAB-INF-28G-5
Installing and Cabling 10GBASE-X X2 Transceiver Uplink Ports
The 10-Gigabit X2 transceiver can have either a spring-loaded latch sleeve or a latch sleeve that is not
spring loaded. Both transceiver types are functionally identical.
Caution
The X2 transceiver is a static-sensitive device. Always use an ESD wrist strap or similar individual
grounding device when handling X2 transceivers or coming in contact with system modules.
To install an X2 transceiver uplink port, follow these steps:
Using a small flat-blade screwdriver, carefully pry the X2 transceiver port cover off of the supervisor
Step 1
engine faceplate.
Use the two arrows on the port cover as guides for inserting the screwdriver blade. Save the port cover
for future use.
Step 2
Remove the X2 transceiver from its protective packaging.
Note
Step 3
Check the label on the X2 transceiver body to verify that you have the correct model for your network.
OL-5781-08
Cabling a CX4 (Copper) XENPAK Transceiver
4X InfiniBand
connector
Do not remove the optical bore dust plugs until directed to do so later in the procedure.
XENPAK-10GB-CX4
Catalyst 6500 Series Switches Installation Guide
Attaching the Interface Cables
3-73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents