Cisco 6503 - Catalyst Firewall Security Sys Installation Manual page 191

Installation guide
Hide thumbs Also See for 6503 - Catalyst Firewall Security Sys:
Table of Contents

Advertisement

Chapter 3
Installing the Switch
To install and cable a XENPAK transceiver uplink port, follow these steps:
Attach an ESD-preventive wrist strap to your wrist and to the ESD ground connector or to a properly
Step 1
grounded bare metal surface.
Loosen the two screws that secure the uplink port cover plate to the supervisor engine faceplate and
Step 2
remove the cover plate. Save the cover plate for future use.
Remove the XENPAK transceiver from its protective packaging.
Step 3
Note
Check the label on the XENPAK transceiver body to verify that you have the correct model for your
Step 4
network.
Find the transmit (TX) and receive (RX) markings that identify the top side of the XENPAK transceiver.
Step 5
Note
Position the XENPAK transceiver in front of the uplink port opening and slide the XENPAK transceiver
Step 6
into the opening until you determine that the XENPAK transceiver faceplate is in contact with the
supervisor engine faceplate. (See
seated in the supervisor engine socket.
Figure 3-40
Captive installation
Optical bore
dust plugs
OL-5781-08
Do not remove the optical bore dust plugs until you are directed to do so later in the procedure.
On some XENPAK transceivers, the TX and RX marking might be replaced by arrows pointing
from the XENPAK transceiver connector (transmit direction or TX) and toward the connector
(receive direction or RX).
Figure
Installing a XENPAK Transceiver
screws
T X
R X
3-40.) This step ensures that the XENPAK transceiver is fully
Catalyst 6500 Series Switches Installation Guide
Attaching the Interface Cables
3-71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6500 series

Table of Contents