General supply conditions
The following supply conditions are applicable to this Simrad ES70 delivery.
Equipment responsibility
The shipyard performing the installation and/or equipment dealer becomes fully
responsible for the equipment upon receipt unless otherwise stated in the contract. The
duration of responsibility includes:
• The period of time the equipment is stored locally before installation.
• During the entire installation process.
• While commissioning the equipment.
• The period of time between commissioning and the final acceptance of the equipment
by the end user (normally the owner of the vessel which the equipment has been
installed).
Unless other arrangements have been made in the contract, the Simrad ES70 guarantee
period (as specified in the contract) begins when the acceptance documents have been
signed