Installing the Rack Server
4. Place the screw retaining plate against the inside of the vertical rack rail and at
the same time, align the two thumbscrews on the cable management arm with the
two screw holes on the retaining plate (1).
5. Tighten both thumbscrews to secure the cable management arm to the rack (2).
Figure 4-12: Securing the cable management arm to the
rack
Connecting the Power Cord and Peripheral Devices
After the server has been installed in the rack, connect the power cord and peripheral
devices to the connectors located on the rear panel of the server. Icons on the back of
the server identify the function of each connector.
WARNING: To reduce the risk of electrical shock or fire, do not plug
telecommunications/telephone connectors into the NIC receptacles.
IMPORTANT: If the Remote Insight Lights-Out Edition II (RILOE II) board is installed in the
server, be sure that you connect the video cable to the video connector on the rear of the
RILOE II board. The standard video connector on the server rear panel is not used when the
RILOE II board is installed.
4-14
HP ProLiant ML370 Generation 3 Server Setup and Installation Guide