Installing the Cable Management Arm

A triple-hinged cable management arm ships with each server. This arm attaches to
the server chassis and to the rear frame of the rack. Hook-and-loop straps included
with the management arm tie down and manage all cables leading to and from the
server.
Two hinges enable the cable management arm and cables to move forward through
the rack when the server is extended. A third hinge allows the cable management arm
to swing back and out of the way during hot-plug power supply installation and
removal procedures.
IMPORTANT: Install the cable management arm after the server is installed in the rack.
To attach the cable management arm to the server and rack:
1. Align the two keyholes on the cable management arm over the spools on the rear
panel of the chassis.
2. Slide the arm down (1) to secure the keyholes onto the spools.
3. Tighten the thumbscrew to secure the cable management arm to the server (2).
Figure 4-11: Securing the cable management arm to the
server
HP ProLiant ML370 Generation 3 Server Setup and Installation Guide
Installing the Rack Server
4-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ml370 - proliant - g3Ml370 - proliant - g3

Table of Contents