Powering Up The Server - HP 195294-001 - ProLiant - ML370R Setup And Installation Manual

Hp proliant ml370 generation 3 setup and installation guide
Hide thumbs Also See for 195294-001 - ProLiant - ML370R:
Table of Contents

Advertisement

Installing the Tower Server

Powering Up the Server

Power up the server after the peripheral and power cords are connected to the server.
WARNING: To reduce the risk of electrical shock or damage to the equipment:
To power up the server:
1. Connect the power cords to the AC power source.
2. Open the front bezel and press the Power On/Standby button.
Figure 5-2: Pressing the Power On/Standby button
5-4
Do not disable the power cord grounding plug. The grounding plug is an
important safety feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily
accessible at all times.
Unplug the power cord from each power supply to disconnect power to the
equipment.
Do not route the power cord where it can be walked on or pinched by items
placed against it. Pay particular attention to the plug, electrical outlet, and
the point where the cord exits from the server.
HP ProLiant ML370 Generation 3 Server Setup and Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ml370 - proliant - g3Ml370 - proliant - g3

Table of Contents