System Setup Requirements

When using the ASD as an integral part of a larger system, it is the responsibility of the ASD
Installer/Maintenance personnel to ensure that there is a fail-safe in place (i.e., an arrangement
designed to switch the system to a safe condition if there is a fault or failure).
System safety features should be employed and designed into the integrated system in a manner
such that system operation, even in the event of system failure, will not cause harm or result in
system damage or injury to personnel (i.e., E-Off, Auto-Restart settings, System Interlocks, etc.).
The programming setup and system configuration of the ASD may allow it to start the motor
unexpectedly. A familiarity with the Auto-Restart settings are a requirement to use this product.
Power factor improvement/correction capacitors or surge absorbers MUST NOT be installed on
the output of the ASD.
Use of the built-in system protective features is highly recommended (i.e., E-Off, Overload
Protection, etc.).
The operating controls and system status indicators should be clearly readable and positioned
where the operator can see them without obstruction.
Additional warnings and notifications shall be posted at the equipment installation location as
deemed required by
There may be thermal or physical properties, or ancillary devices integrated into the overall system
that may allow for the ASD to start the motor without warning. Signs to this effect must be posted
at the equipment installation location.
If a secondary magnetic contactor (MC) or an ASD output disconnect is used between the ASD and
the load, it should be interlocked to halt the ASD before the secondary contact opens. If the output
contactor is used for bypass operation, it must be interlocked such that commercial power is never
applied to the ASD output terminals (U, V, or W).
When using an ASD output disconnect, the ASD and the motor must be stopped before the
disconnect is either opened or closed. Closing the output disconnect while the 3-phase output of the
ASD is active may result in equipment damage or injury to personnel.
8
Qualified
Personnel.
CAUTION