Magnet Installation; Din-Rail Installation - Planet WGS-5225-8P2SV User Manual

Industrial l2+ 8-port 10/100/1000t 802.3at poe+2-port 1g/2.5g sfp wall-mount managed switch
Hide thumbs Also See for WGS-5225-8P2SV:
Table of Contents

Advertisement

2.2.2

Magnet Installation

To install the Wall-mount Managed Switch on a magnetic surface, simply follow the following diagram:
2.2.3

DIN-rail Installation

The DIN-rail kit is included in the package. When the wall-mount application for the Wall-mount Managed Switch needs to be
replaced with DIN-rail application, please refer to the following figures to screw the DIN-rail on the Wall-mount Managed
Switch. To hang up the Wall-mount Managed Switch, follow the steps below:
Step 1: Screw the DIN-rail on the Wall-mount Managed Switch.
User's Manual of WGS-5225-8P2S Series
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wgs-5225-8p2s

Table of Contents