Hardware Installation; Rack Mounting - Planet GSW-1820HP User Manual

16-/24-port 10/100/1000t 802.3at poe + 2-port 1000x sfp gigabit ethernet switch
Table of Contents

Advertisement

5. Hardware Installation

5.1 Rack Mounting

To install the 802.3at PoE+ Switch in a 19-inch standard rack, follow the
instructions described below.
Step 1: Place your 802.3at PoE+ Switch on a hard flat surface, with the front
panel positioned towards your front side.
Step 2: Attach a rack-mount bracket to each side of the 802.3at PoE+
Switch with supplied screws attached to the package. Figure 5-1
shows how to attach brackets to one side of the 802.3at PoE+
Switch.
Figure 5-1: Attaching the Brackets to the 802.3at PoE+ Switch.
You must use the screws supplied with the mounting brackets.
Damage caused to the parts by using incorrect screws would
invalidate the warranty.
Step 3: Secure the brackets tightly.
Step 4: Follow the same steps to attach the second bracket to the opposite
side.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsw-2620hp

Table of Contents