324 Port InfiniBand FDR Switch Platform Hardware Installation Guide
The spine side
of the shelf has
two slots for
the extension
Adjustable shelf
brackets
Step 8.
Step 9.
Mellanox Technologies
Figure 10: Shelf Brackets
Tighten the 16 hex head bolts on the adjustable brackets.
Figure 11: U Numbering Above Shelf
3
2
1
Place 8 caged nuts into the vertical rack support at the locations corresponding
to the holes in the chassis faceplate. The holes in the faceplate start at 2U
above the shelf and are spaced every 4U centered as you go up the vertical
rack support. There are 4 holes on each side.
3
These numbers are num-
2
bers relative to the top of
the shelf.
1
The first cage nut on the spine side
goes here. The next six caged nuts go
every 4 U units up from here.
Top of
Shelf
Rev 1.0
21