324 Port InfiniBand FDR Switch Platform Hardware Installation Guide
Step 2.
Step 3.
Step 4.
Mellanox Technologies
Figure 13: Place the Upper Bracket Offset
Screw on the two Upper Bracket offsets onto the chassis using nine flat head
screws for each offset.
The offsets are right and left handed. Place the offsets so that the flat head screws go into
the bevelled side of the offset.
Figure 14: Attach the Shelf Extension
Screw on the shelf extension using two bolts with flat washers.
If you are installing the cable management system, place 10 caged nuts on the
other side of the rack in the vertical supports.
Rev 1.0
23