324 Port InfiniBand FDR Switch Platform Hardware Installation Guide
- 20 pan head screws for the caged nuts 12
for the shelf and 8 for the chassis faceplate
- 32 lock washers – 20 for the lock down
bars and 12 for the upper brackets to
upper bracket offsets
- 2 upper brackets
- 1 open end ratchet wrench 10mm
- 1 socket wrench
- 2 extensions for the socket driver
- flat washers for the shelf extension
•
Parts included in the cable management installation kit:
- 1 cable management rack RH
- 10 caged nuts M6
Shelf extension
Upper bracket
Upper bracket
washer
Upper bracket offset
Flat washers
Lock washers
Mellanox Technologies
- 20 flat washers– 8 for the lock down bars
and 12 for the upper brackets
- 32 hex head bolts – 20 for the lock down
bars and 12 for the upper brackets to upper
bracket offsets
- 12 flat head screws with locktite for the
upper bracket offsets
- 1 socket nut driver 8mm
- 1 socket nut driver 10mm
- 1 socket nut driver 13mm
- 1 box wrench
- 1 cable management rack LH
- 10 M6 bolts
Figure 2: Installation Kit Parts
Shelf
Phillips pan head
Caged nuts
screw
Lock-down bar
hex head bolt
Flat head screw
Rev 1.0
15