Rev 1.0
Step 23.
Remove the shelf extension and save for removal of the chassis.
Step 24.
Connect a valid ground, See Section 3, "Ground Connections," on page 34, for
detailed instructions.
Step 25.
Tighten the faceplate screws. See Figure 18.
Step 26.
Tighten the upper bracket to upper bracket offset screws. See Figure 21.
Step 27.
Tighten the lock down bars. See Figure 23.
Step 28.
Go to Section 6, "Chassis Power Up," on page 39 to power up the switch system.
1.7
Installing the Leafs
The leaf boards can be installed in any of the available leaf slots.
Push the latch release.
Step 1.
Start with the latch fully open, that is 45
30
Figure 24: Bolt and Washer Order
Figure 25: Ejector Latch
Leaf
o
to the front panel of the leaf.
Chassis Installation
Leaf
Mellanox Technologies