Figure 5: Vertical Rack Supports Dimension - Mellanox Technologies MSX6518-6R Hardware Installation Manual

324 port infiniband fdr switch platform
Table of Contents

Advertisement

Rev 1.0
It is recommended to set the top of the shelf at U5. Try and keep the chassis as low as
possible.
The maximum height that the chassis can be mounted, will be determined by the maximum height
that the fork lift can raise the pallet.
Step 2.
Open the Installation kit and make sure that all of the parts are in the box. See
Figure 2,"Installation Kit Parts".
Installing the chassis in the rack with the spine side as close as possible to the door leaves maxi-
mum room for the cable management system.
The distance between the vertical supports must be between 65 cm (25.6") and 80 cm
(31.5"). If the distance in your rack is different, move the vertical supports so that one
pair is 10 cm(4in.) away from the door and that the vertical supports are between 65
cm (25.6") and 80 cm (31.5") apart.
The side of the chassis with the spine units will sit flush with the vertical supports of
the rack. The side of the chassis with the QSFP connectors will sit at the edge of the
shelf closer to the center of the rack.
18

Figure 5: Vertical Rack Supports Dimension

Vertical Supports
Chassis Installation