Epson G Series Maintenance Manual page 174

Hide thumbs Also See for G Series:
Table of Contents

Advertisement

G3 Maintenance 7. Joint #3
(10) Apply the proper tension to the Z belt, and
(11) Connect the connectors.
(12) Connect the backup connectors for Joint #3 and #4 (X63, X64) to the battery board.
(13) Re-bundle the cables in their original positions with a wire tie removed in step (5).
(14) Install the arm top cover and the arm bottom cover.
(15) Perform the calibration of Joint #3 and #4.
156
then secure the Joint #3 motor unit.
To do so, pass a suitable cord or string around
the Joint #3 motor unit near its mounting
plate.
Then, pull the cord using a force
gauge or similar tool to apply the specified
tension shown in the figure on the right.
Connectors: X231, X241, X31, X32, X41
Bundle the backup cable with wire tie to prevent the cable connector to fall off by
mistake.
Do not allow unnecessary strain on the cables.
For details, refer to 3. Covers.
For details, refer to 14. Calibration.
Z belt tension = 74 N (7.5 ± 0.5 kgf)
Joint #3
motor unit
Force gauge
3-M4×12 + washer
G series Maintenance Rev.3

Advertisement

Table of Contents
loading

Table of Contents