General Maintenance; Maintenance Inspection; Schedule For Maintenance Inspection - Epson G Series Maintenance Manual

Hide thumbs Also See for G Series:
Table of Contents

Advertisement

G1 Maintenance 2. General Maintenance

2. General Maintenance

This chapter describes maintenance inspections and procedures. Performing maintenance
inspections and procedures properly is essential for preventing trouble and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.

2.1 Maintenance Inspection

2.1.1 Schedule for Maintenance Inspection

Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and annual.
The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points must
be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
1 month (250 h)
2 months (500 h)
3 months (750 h)
4 months (1000 h)
5 months (1250 h)
6 months (1500 h)
7 months (1750 h)
8 months (2000 h)
9 months (2250 h)
10 months (2500 h)
11 months (2750 h)
12 months (3000 h)
13 months (3250 h)
20000 h
h = hour
4
Daily
Monthly
inspection
inspection
Inspection Point
Quarterly
Biannual
inspection
inspection
Annual
Overhaul
inspection
(replacement)
G series Maintenance Rev.3

Advertisement

Table of Contents
loading

Table of Contents