Download Print this page

KidKraft Cedar Summit F25745E Installation And Operating Instructions Manual page 52

Advertisement

Step 20: Swing Beam Assembly
Part 1
A: Attach 6 Heavy Duty Swing Hangers to (201) Engineered SW Beam using 2 (G13) 5/16 x 6-1/8" Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) per swing hanger, as shown in fig. 20.1 and 20.2.
B: Attach 1 Spring Loaded Quick Link to each Heavy Duty Swing Hanger. (fig. 20.3)
C: Install 1 (WB7) 5/16 x 3" Wafer Bolt (with flat washer and t-nut) in the middle bolt hole, from the bottom
up, in (201) Engineered SW Beam as shown in fig. 20.1 and 20.4. IT IS IMPORTANT THAT THIS BOLT IS
ATTACHED. IT WILL MINIMIZE CHECKING OF WOOD.
D: Attach Cedar Summit / Kidkraft Plaque to centre of (201) Engineered SW Beam (over top of t-nut) using 4
(S38) #7 x 1-1/8" Pan Screws. (fig. 20.5)
Fort End
Heavy Duty
Swing Hanger
Fig. 20.2
G13
5/16"
T-Nut
Fig. 20.4
5/16" Flat
Washer
WB7
Wood Parts
1 x
Engineered SW Beam 3 x 5-1/4 x 92"
201
201
5/16"
Lock Nut
5/16" Flat
Washer
Plastic
Formed
Washer
201
5/16" Flat
Washer
201
Spring Loaded Quick
Link in the closed
position
12 x
5/16 x 6-1/8" Hex Bolt
G13
(5/16" flat washer x 2, 5/16" lock nut & plastic formed washer)
1 x
5/16 x 3" Wafer Bolt
WB7
(5/16" flat washer, 5/16" t-nut)
4 x
#7 x 1-1/8" Pan Screw
S38
Heavy Duty
Swing Hanger x 6
Heavy Duty
Swing Hanger
Caution: The Spring Loaded Quick Link
must be attached to the Heavy Duty Swing
Hanger in the closed position. (fig. 20.4)
Hardware
52
Fig. 20.1
Cedar Summit / Kidkraft
Plaque
Other Parts
6 x Heavy Duty Swing Hangers
6 x Spring Loaded Quick Link
1 x Cedar Summit / Kidkraft
Plaque
Swing End
Fig. 20.3
Spring
Loaded
Quick Link
Fig. 20.5
S38
x 4
201

Advertisement

loading

This manual is also suitable for:

Cedar summit lookout extreme