Download Print this page

KidKraft Cedar Summit F25745E Installation And Operating Instructions Manual page 104

Advertisement

Step 57: Assemble Rock Wall
Part 4
I: On (058) Rock Wall C, measure 6" up from the floorboards and center 1 Steel Hand Grip. Mark the hole
locations and pre-drill with a 1/8" drill bit making sure holes are centered. Attach Steel Hand Grip using 2 (WL3)
1/4 x 1-3/8" Wafer Lags (with flat washer).
Fig. 57.6
058
Hardware
2 x
1/4 x 1-3/8" Wafer Lag
WL3
(1/4" flat washer)
104
1/4" Flat
Washer
WL3
Steel
Hand Grip
6"
Other Parts
1 x Steel Hand Grip

Advertisement

loading

This manual is also suitable for:

Cedar summit lookout extreme