Operation; Start Up; Energy Saving Idle Shutdown; Charging - Webasto SVS100 Installation, Operation And Maintenance Manual

Gse intelligent fast charging systems
Table of Contents

Advertisement

5 Operation

5.1

Start Up

When you first power up your Industrial PosiCharge, it will perform a lighting sequence test. The
display will then show the initial Status Screen containing the model number, the software version
and the output current capability. After five seconds, the screen will shift to the charge screens.

5.2 Energy Saving Idle Shutdown

The charger will shut down to conserve energy when no vehicle is connected. During idle
shutdown the display will be dark. When a vehicle connects the system will start and charging
will begin. About 10 minutes after the vehicle disconnects the system will shutdown.
5.3

Charging

Step 1: Connect battery to charger
To start charging, simply connect the battery to the charger. Once the charge starts, and the
"Charging" screen is displayed, the current is ramped up from zero to the target start current.
The display screen will periodically update the charging data as the charge progresses. In
addition, the front panel has several status LEDs which indicate the current status of the
battery under charge, and whether it is scheduled for an equalization charge.
23435-W-03-01
SVS100 Installation, Operation and Maintenance Manual
SVS100
250 Amps
Version
2.07.03.15
Charger Ready
Connect Vehicle
Vehicle Connected
Vehicle connected
Getting config info
Communication established
Preparing to charge
Please wait...
Preparing to charge
Please wait 30 sec
Charging
45.5V
150A

Figure 5- 1 Connecting Status Screens

22
73%
71F
Webasto Charging Systems, Inc.

Advertisement

Table of Contents
loading

Table of Contents