Webasto SVS100 Installation, Operation And Maintenance Manual page 47

Gse intelligent fast charging systems
Table of Contents

Advertisement

To replace cables:
1. Remove the screws and open the front door of the GSE SVS-100.
2. Locate the BMID Communication Terminal Blocks and DC Output Studs. Refer to
3. Disconnect the Communication Wires from their terminal block.
4. Remove the strain relief collar of the Communication Wires.
5. Remove the Communication Wires.
6. Remove the two 8M nuts from the DC Output Studs (Positive and Negative).
7. Open the strain relief collars of the Power Cables, by rotating the two internal bezels.
8. Re-install new cables in the reverse order, making sure that the polarity correct polarity is
respected, the strain relief is seated properly, and all the screws and nuts have been
tightened properly. Recommended torque: 20-25 Nm (177-221 in-lbs)
9. Close the front door prior to switching on the utility power and/or connecting a battery.
CAUTION
23435-W-03-01
SVS100 Installation, Operation and Maintenance Manual
Always be sure to completely re-install the strain relief when replacing the
DC Output Cables.
47
Webasto Charging Systems, Inc.
.
Figure 6- 1

Advertisement

Table of Contents
loading

Table of Contents