Controlpower Transformer T2; Idle Power Supervisory Board (Ipsb); Figure 4-4 Dual Voltage Systems (480/600Vac) - Location Of Auxiliary Transformer Terminal Block; Figure 4-5 Dual Voltage Systems (480/600Vac) - Location Of Ipsb Tb1 Terminal Block - Webasto SVS100 Installation, Operation And Maintenance Manual

Gse intelligent fast charging systems
Table of Contents

Advertisement

SVS100 Installation, Operation and Maintenance Manual

4.7.2 ControlPower Transformer T2

Figure 4-4 Dual Voltage Systems (480/600VAC) - Location of Auxiliary Transformer Terminal
Block
Note: If the Charger has an ADK transformer blue input wire stays on the 480V.

4.7.3 Idle Power Supervisory Board (IPSB)

Move black wire to 600V input (TB1-5)

Figure 4-5 Dual Voltage Systems (480/600VAC) - Location of IPSB TB1 Terminal Block

23435-W-03-01
Webasto Charging Systems, Inc.
16

Advertisement

Table of Contents
loading

Table of Contents